top of page
LABOURDONNAIS WATERFRONT HOTEL
ONGOING HOTEL RENOVATION
PORT LOUIS, MAURITIUS
Public spaces: June 2014 - August 2015
Guest rooms: December 2016 - Present
-
-
-
-
-
-
ROLE ON PROJECT
Interior Designer
PROJECT SCOPE
2014/2015 Renovation of the following areas:
Port cochere | Lobby | Coffee lounge | Dining areas | Terrace bar | Conferencing | Executive lounge | Presidential suite
​
2017/2018 Renovation of the following areas:
Guest Rooms | Suites | Late check-in Lounge
Office team leader
Supervising & producing design documentation, FF&E specifications and all relevant contract documentation
Preliminary site visits to meet with the client and operator
Site inspections.
As interior designer on this project, I had been involved in all stages of this project. I assisted with the production and development of the concept and physical and digital presentations.
PROJECT OVERVIEW
Project Duties:
Working with the concept of the head designer, my role included:
Site survey
Various site visits to deal with local contractors, shop fitters and suppliers to ensure the quality of what was produced was up to standard
Taking part in various project meetings &
assisting with coordination between architects, engineers and contractors
*IN ADDITION TO THE ABOVE MENTIONED DUTIES, MY ROLE ON THE 2017 GUEST ROOM RENOVATION INCLUDES CONCEPTUAL DESIGNER FOR THE ROOMS AND SUITES.*
bottom of page